Details
The Omaha Park 8 cast-in-place parking structure consists of over 430,000 square feet. Eight
parking tiers house 1293 stalls that are 8’6” wide. The garage project included the construction of a
new 650-foot tunnel beneath Dodge Street that connects Omaha Park 8 to the Union Pacific
Railroad Headquarters building. The project was completed in 2004. Omaha Park 4 was completed
in 1996 and was recognized by the American Institute of Architects in 1997 with an Architectural
Honor Award. With 60,000 square feet per level, Omaha Park 4 was built to house over 450
parking spaces. Using corrugated metal roofs and brick cladding, the garage was designed and
built to blend in with the surrounding historical structures in Omaha’s historical Old Market district.